|
Item List 254206 |
Date:02/06/2026 |
|
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 254206 | Primary Project Number | 0601900272503 |
| Contract Description | ALEXANDRIA PIKE (US 27) | ||
| Primary County | CAMPBELL | Fed/St Number | HSIP 0272(123) |
| Vendor ID | 00117 | Vendor Name | EATON ASPHALT PAVING CO INC |
| Bid Amount | $ 786,433.56 | ||
| SM- Project | 0601900272503 |
| Fed/State Number | HSIP 0272(123) |
| Project Description | ALEXANDRIA PIKE (US 27) |
| *********** |
| SM- Project | 0601900272503 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0005 | CRUSHED STONE BASE | 00003 | 1,231.000 |
1,231.000 |
$54.250 |
TON | 8.5 |
| 0010 | GEOGRID REINFORCEMENT FOR SUBGRADE | 00005 | 2,057.000 |
2,057.000 |
$3.900 |
SQYD | 1.0 |
| 0015 | ASPHALT SEAL AGGREGATE | 00100 | 14.000 |
14.000 |
$526.500 |
TON | 0.9 |
| 0020 | ASPHALT SEAL COAT | 00103 | 2.000 |
2.000 |
$1,400.000 |
TON | 0.4 |
| 0025 | LEVELING & WEDGING PG64-22 | 00190 | 20.000 |
20.000 |
$475.000 |
TON | 1.2 |
| 0030 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 813.000 |
813.000 |
$128.000 |
TON | 13.2 |
| 0035 | ASPHALT MATERIAL FOR TACK | 00356 | 3.700 |
3.700 |
$1.000 |
TON | 0.0 |
| 0040 | CL3 ASPH SURF 0.38B PG64-22 | 00388 | 237.000 |
237.000 |
$198.000 |
TON | 6.0 |
| 0045 | MOBILIZATION FOR MILL & TEXT CAMPBELL US 27 HSIP | 02676 | 1.000 |
1.000 |
$3,950.000 |
LS | 0.5 |
| 0050 | ASPHALT PAVE MILLING & TEXTURING | 02677 | 94.000 |
94.000 |
$106.000 |
TON | 1.3 |
| 0055 | JOINT ADHESIVE | 20071EC | 2,991.000 |
2,991.000 |
$1.200 |
LF | 0.5 |
| 0060 | LONGITUDINAL EDGE KEY | 21289ED | 1,533.000 |
1,533.000 |
$6.550 |
LF | 1.3 |
Category Total $273,013.10 |
| SM- Project | 0601900272503 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0065 | STORM SEWER PIPE-18 IN | 00522 | 399.000 |
399.000 |
$78.000 |
LF | 4.0 |
| 0070 | STORM SEWER PIPE-24 IN | 00524 | 8.000 |
8.000 |
$422.000 |
LF | 0.4 |
| 0075 | NON-PERFORATED PIPE-4 IN | 01010 | 6.000 |
6.000 |
$225.000 |
LF | 0.2 |
| 0080 | DROP BOX INLET TYPE 5D | 01511 | 3.000 |
3.000 |
$4,765.000 |
EACH | 1.8 |
| 0085 | REMOVE DROP BOX INLET | 01585 | 1.000 |
1.000 |
$1,225.000 |
EACH | 0.2 |
| 0090 | STANDARD HEADER CURB | 01875 | 240.000 |
240.000 |
$47.500 |
LF | 1.4 |
| 0095 | STANDARD BARRIER MEDIAN TYPE 2 | 01917 | 437.000 |
437.000 |
$139.500 |
SQYD | 7.8 |
| 0100 | STANDARD BARRIER MEDIAN TYPE 3 | 01919 | 90.000 |
90.000 |
$140.750 |
SQYD | 1.6 |
| 0105 | STANDARD BARRIER MEDIAN TYPE 4 | 01921 | 182.000 |
182.000 |
$153.000 |
SQYD | 3.5 |
| 0110 | DELINEATOR FOR GUARDRAIL MONO DIRECTIONAL WHITE | 01982 | 5.000 |
5.000 |
$20.000 |
EACH | 0.0 |
| 0115 | BARRICADE-TYPE III | 02014 | 4.000 |
4.000 |
$168.500 |
EACH | 0.1 |
| 0120 | TEMP DITCH | 02159 | 553.000 |
553.000 |
$7.500 |
LF | 0.5 |
| 0125 | CLEAN TEMP DITCH | 02160 | 276.000 |
276.000 |
$5.500 |
LF | 0.2 |
| 0130 | ROADWAY EXCAVATION | 02200 | 2,217.000 |
2,217.000 |
$47.000 |
CUYD | 13.2 |
| 0135 | DITCHING | 02237 | 250.000 |
250.000 |
$13.500 |
LF | 0.4 |
| 0140 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 350.000 |
350.000 |
$31.000 |
LF | 1.4 |
| 0145 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 1.000 |
1.000 |
$5,000.000 |
EACH | 0.6 |
| 0150 | REMOVE GUARDRAIL | 02381 | 205.000 |
205.000 |
$2.000 |
LF | 0.1 |
| 0155 | CHANNEL LINING CLASS II | 02483 | 350.000 |
350.000 |
$113.000 |
TON | 5.0 |
| 0160 | CLEARING AND GRUBBING (APPROXIMATELY 1.00 AC) | 02545 | 1.000 |
1.000 |
$3,500.000 |
LS | 0.4 |
| 0165 | TEMPORARY SIGNS | 02562 | 600.000 |
600.000 |
$5.000 |
SQFT | 0.4 |
| 0170 | FABRIC-GEOTEXTILE CLASS 1 | 02602 | 450.000 |
450.000 |
$3.250 |
SQYD | 0.2 |
| 0175 | FABRIC-GEOTEXTILE CLASS 2 FOR PIPE | 02607 | 699.000 |
699.000 |
$2.000 |
SQYD | 0.2 |
| 0180 | MAINTAIN & CONTROL TRAFFIC CAMPBELL US 27 HSIP | 02650 | 1.000 |
1.000 |
$17,150.000 |
LS | 2.2 |
| 0185 | LANE CLOSURE | 02653 | 3.000 |
3.000 |
$1,950.000 |
EACH | 0.7 |
| 0190 | TRUCK MOUNTED ATTENUATOR | 02654 | 1.000 |
1.000 |
$12,750.000 |
EACH | 1.6 |
| 0195 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 4.000 |
4.000 |
$1,150.000 |
EACH | 0.6 |
| 0200 | EDGELINE RUMBLE STRIPS | 02697 | 1,079.000 |
1,079.000 |
$4.600 |
LF | 0.6 |
| 0205 | TEMP SILT FENCE | 02701 | 553.000 |
553.000 |
$4.850 |
LF | 0.3 |
| 0210 | SILT TRAP TYPE A | 02703 | 1.000 |
1.000 |
$202.000 |
EACH | 0.0 |
| 0215 | SILT TRAP TYPE B | 02704 | 1.000 |
1.000 |
$202.000 |
EACH | 0.0 |
| 0220 | SILT TRAP TYPE C | 02705 | 3.000 |
3.000 |
$220.000 |
EACH | 0.1 |
| 0225 | CLEAN SILT TRAP TYPE A | 02706 | 1.000 |
1.000 |
$130.000 |
EACH | 0.0 |
| 0230 | CLEAN SILT TRAP TYPE B | 02707 | 1.000 |
1.000 |
$130.000 |
EACH | 0.0 |
| 0235 | CLEAN SILT TRAP TYPE C | 02708 | 3.000 |
3.000 |
$130.000 |
EACH | 0.0 |
| 0240 | STAKING CAMPBELL US 27 HSIP | 02726 | 1.000 |
1.000 |
$14,395.000 |
LS | 1.8 |
| 0245 | ARROW PANEL | 02775 | 2.000 |
2.000 |
$200.000 |
EACH | 0.1 |
| 0250 | TUBULAR MARKERS | 03225 | 12.000 |
12.000 |
$425.000 |
EACH | 0.6 |
| 0255 | EROSION CONTROL BLANKET | 05950 | 2,500.000 |
2,500.000 |
$2.450 |
SQYD | 0.8 |
| 0260 | TEMP MULCH | 05952 | 3,467.000 |
3,467.000 |
$0.400 |
SQYD | 0.2 |
| 0265 | TEMP SEEDING AND PROTECTION | 05953 | 2,600.000 |
2,600.000 |
$0.430 |
SQYD | 0.1 |
| 0270 | INITIAL FERTILIZER | 05963 | 0.300 |
0.300 |
$1,900.000 |
TON | 0.1 |
| 0275 | MAINTENANCE FERTILIZER | 05964 | 0.200 |
0.200 |
$1,900.000 |
TON | 0.0 |
| 0280 | SEEDING AND PROTECTION | 05985 | 2,700.000 |
2,700.000 |
$1.050 |
SQYD | 0.4 |
| 0285 | AGRICULTURAL LIMESTONE | 05992 | 3.000 |
3.000 |
$165.000 |
TON | 0.1 |
| 0290 | PAVE STRIPING-THERMO-6 IN W | 06542 | 5,816.000 |
5,816.000 |
$1.150 |
LF | 0.9 |
| 0295 | PAVE STRIPING-THERMO-6 IN Y | 06543 | 2,957.000 |
2,957.000 |
$1.150 |
LF | 0.4 |
| 0300 | PAVE STRIPING-THERMO-12 IN W | 06546 | 122.000 |
122.000 |
$4.000 |
LF | 0.1 |
| 0305 | PAVE STRIPING-TEMP REM TAPE-B | 06549 | 210.000 |
210.000 |
$3.500 |
LF | 0.1 |
| 0310 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 1,350.000 |
1,350.000 |
$2.650 |
LF | 0.5 |
| 0315 | PAVE STRIPING-TEMP REM TAPE-Y | 06551 | 5,875.000 |
5,875.000 |
$2.650 |
LF | 2.0 |
| 0320 | PAVE STRIPING-DUR TY 1-6 IN W | 06556 | 596.000 |
596.000 |
$10.000 |
LF | 0.8 |
| 0325 | PAVE STRIPING-DUR TY 1-6 IN Y | 06557 | 216.000 |
216.000 |
$10.000 |
LF | 0.3 |
| 0330 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 28.000 |
28.000 |
$13.000 |
LF | 0.0 |
| 0335 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 28.000 |
28.000 |
$13.000 |
LF | 0.0 |
| 0340 | PAVE MARKING-THERMO CROSS-HATCH | 06569 | 173.000 |
173.000 |
$4.000 |
SQFT | 0.1 |
| 0345 | PAVE MARKING-THERMO CROSS-HATCH | 06569 | 173.000 |
173.000 |
$4.000 |
SQFT | 0.1 |
| 0350 | PAVE MARKING-THERMO CURV ARROW | 06574 | 6.000 |
6.000 |
$125.000 |
EACH | 0.1 |
| 0355 | PAVE MARKING-THERMO CURV ARROW | 06574 | 6.000 |
6.000 |
$125.000 |
EACH | 0.1 |
| 0360 | PAVE MARKING-THERMO ONLY | 06576 | 1.000 |
1.000 |
$400.000 |
EACH | 0.1 |
| 0365 | CONCRETE-CLASS A | 08100 | 2.000 |
2.000 |
$675.000 |
CUYD | 0.2 |
| 0370 | REMOVE AND RESET PERF PIPE HEADWALL | 20758ED | 1.000 |
1.000 |
$725.000 |
EACH | 0.1 |
| 0375 | WATER BLASTING EXISTING STRIPE | 22664EN | 350.000 |
350.000 |
$6.000 |
LF | 0.3 |
| 0380 | PAVE MARK TY 1 TAPE DOTTED LANE EXT | 23254ES717 | 4.000 |
4.000 |
$4.000 |
LF | 0.0 |
| 0385 | PAVE MARK TY 1 TAPE-CURV ARROW | 23270ES717 | 1.000 |
1.000 |
$500.000 |
EACH | 0.1 |
| 0390 | PAVE MARK TY 1 TAPE-CURV ARROW (U-TURN) | 23270ES717 | 1.000 |
1.000 |
$800.000 |
EACH | 0.1 |
| 0395 | PAVE MARK THERMO CHEVRON | 24679ED | 103.000 |
103.000 |
$4.000 |
SQFT | 0.1 |
| 0400 | PAVE MARKING-THERMO DOTTED LANE EXTEN (12 IN) | 24683ED | 106.000 |
106.000 |
$12.000 |
LF | 0.2 |
| 0405 | PAVE MARKING-THERMO DOTTED LANE EXTEN (6 IN) | 24683ED | 103.000 |
103.000 |
$8.000 |
LF | 0.1 |
| 0410 | PAVE MARKING-THERMO U-TURN | 24889EC | 11.000 |
11.000 |
$500.000 |
EACH | 0.7 |
| 0415 | THRIE BEAM GUARDRAIL TRANSITION TL-3 | 25078ED | 1.000 |
1.000 |
$3,500.000 |
EACH | 0.4 |
| 0420 | PAVE MARK TY 1 TAPE CHEVRON | 26166ES717 | 45.000 |
45.000 |
$25.000 |
SQFT | 0.1 |
| 0425 | ELECTRONIC DELIVERY MGMT SYSTEM - AGG | 26248EC | 1.000 |
1.000 |
$0.000 |
LS | 0.0 |
| 0430 | ELECTRONIC DELIVERY MGMT SYSTEM - AGG | 26248EC | 1.000 |
1.000 |
$0.010 |
LS | 0.0 |
Category Total $486,655.46 |
| SM- Project | 0601900272503 | CATEGORY NUMBER | 0003 | CATEGORY Description | SIGNING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0435 | SBM ALUM SHEET SIGNS .125 IN | 06407 | 54.000 |
54.000 |
$35.000 |
SQFT | 0.2 |
| 0440 | STEEL POST TYPE 1 | 06410 | 155.000 |
155.000 |
$25.000 |
LF | 0.5 |
| 0445 | CLASS A CONCRETE FOR SIGNS | 06490 | 1.000 |
1.000 |
$1,000.000 |
CUYD | 0.1 |
| 0450 | REMOVE & RELOCATE SIGNS | 20418ED | 4.000 |
4.000 |
$1,000.000 |
EACH | 0.5 |
| 0455 | REMOVE SIGN | 21373ND | 6.000 |
6.000 |
$100.000 |
EACH | 0.1 |
| 0460 | GMSS TYPE D | 21596ND | 1.000 |
1.000 |
$1,000.000 |
EACH | 0.1 |
| 0465 | GMSS TYPE D (SURFACE MOUNT) | 21596ND | 3.000 |
3.000 |
$700.000 |
EACH | 0.3 |
| 0470 | BARCODE SIGN INVENTORY | 24631EC | 25.000 |
25.000 |
$20.000 |
EACH | 0.1 |
Category Total $14,965.00 |
| SM- Project | 0601900272503 | CATEGORY NUMBER | 0004 | CATEGORY Description | DEMOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0475 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$11,800.000 |
LS | 1.5 |
Category Total $11,800.00 |